Heavy lifting operations

In large projects sometimes is requested to move the whole TBM across built stations, access tunnels, or by roads, in order to continue tunnel excavation.
Not many time ago we just thought in disassemble the TBM or build a large cradle as the ways to do it.

Recently we have obtained good results using heavy lifting technologies for move TBMs.

This can be a good solution to save costs and time building concrete cradles or steel structures which have to be destroyed immediately after being used.
We have used same technology for replace big TBM components, like cuterhead, in shafts or caves without access neither space for a crane.
This tools allows smooth and precise movements, with an accurate control of efforts and resistances.

 

TBM advance in open station

NFM_TBM_movement_0NFM_TBM_movement_1NFM_TBM_movement_2NFM_TBM_movement_3NFM_TBM_movement_4

TBM advance in closed station

TMB advance in closed stationTMB advance in closed stationTMB advance in closed stationTMB advance in closed station

Cutterhead replacement in a cave

cutterhead_replacement_01cutterhead_replacement_1cutterhead_replacement_2cutterhead_replacement

Complete shield transportation

HK_shield_transport_0HK_shield_transport_1Complete shield transportation